Next loading of around 300 tons steel hall
2021
Next loading of 230 tons project
2021
Next loading of several types of steel railings and glasses
2021
First batch of HSQ beams almost finished for loading
2021
Galvanised and fire-painted structures for North Norway
2021
Over 20m long trusses ready for travel to Scandinavia
2021
Railings and steel basement boxes for next project ready
2021
Loading of primed beams with studs
2021
Bridge structures almost ready for loading
2021
Galvanised steel posts for road project ready
2021
Loading of galvanised stairs and railings
2020
Loading of fire-painted HSQ beams
2020
First loading of 120 tons steel hall produced in 4 weeks
2020
Loading of steel stairs,ladder and railings
2020
Loading of galvanised stairs and railings
2020
Last shipment of spiral concrete stairs
2018
Exclusive spiral stairs on the way to Norway
2018
Steel stairs to norwegian customers on the way today
2018
Stainless steel railings ready for next shipment
2018
Containers with steel up to North loaded
2018
Roof structures designed, produced and loaded into container
2018
Galvanised ventilation grates (lufterister)
2018
Galvanised steel structures on the way out to North Scandinavia
2018
Railings packed into container for further assembly
2018
Production and deliveries of concrete stairs with landings on 2 big projects in Norway moving on
2018
Galvanised and painted structures for school project
2018
Challenging concrete stairs finally loaded
2018
Painted structures loaded according to the schedule
2018
Galvanised and painted steel elements loaded on truck
2018
Bigger shippment of 3 pcs galvanised stairs
2018
Painted steel ready for loading
2018
Galvanised air grates ready for shipment
2018
Painted steel trusses for the school
2018
Steel stairs with steel facade cover loaded
2018
3 pcs steel spiral stairs ready to shipment
2018
Steel for the supermarket designed and delivered
2018
1 of 3 containers with steel structures designed,produced and loaded
2018
Steel hall galvanised to Sweden soon ready for loading
2018
Smaller items just after galvanisation ISO1461 – almost ready for shipment
2018
Shipment of cut tearplates to Norway
2018
Packing and delivery of stainless steel railings
2018
Painted steel for a factory loaded
2018
Oversized 4,2m W trusses on the way to Iceland
2018
Packing of steel structures to Norway
2018
Steel structures, railings, TRP plate loaded in container
2019
Shippment for a hospital building
2019
Steel grates truckload to Norway
2019
Oversized trucks with trusses for a steel hall loaded
2019
Start of loadings of the steel hall
2019
One of bigger loadings of steel rails
2019
Steel structures ready for loading at the vessel
2019
Next steel stairs and railings ready to go to the North
2020
Oversized 25m HSQ beams ready for dispatch
2020
Next loading for school project in North Norway
2020
First shipment of post-office building
2020
Galvanised structures ready for loading
2020
Next shipment of railings
2020
Galvanised structures, railings and ladders
2020
Next loading of steel and glass railings
2020
Next loading for school project in North Norway
2020
Full truck loaded and ready to go to Norway
2020
One of many loadings for 440 tons steel hall incl cladding
2020
Galvanised stairs and railings ready to go to the North Scandinavia
2020
Rounded roof structure ready for shippment
2020
Balcony railings prepared for dispatch
2020
Designed,produced and loaded fire painted structures
2020
Next loading of galvanised and painted balcony railings
2020
Full container of steel stairs and railings ready
2020
One of many packages with steel railings for a stadium project
2020
Next steel hall is rising
2020
One loadings of bridge structures
2020
First elements ready for a new project
2020
Loading of steel bridges on the vessel
2020
Oversized elements for bank governmental project loaded
2020
Fire painted steel structures and railings
2020
One of many shippments for the 550 tons project incl detail design
2020
First loading for a governmental project
2020
Curved steel elements for the museum project
2020
Loading of fire painted structures for a museum project
2020
Painted C5 elements for the road project
2020
Fire-painted R60 roof structures loaded
2020
Start of loading for sport-hall building
2020
Fire painted steel structures-ready to go
2020
First loading of governmental project
2020
One of many containers to the North with steel railings
2020
Galvanised balcony railings
2020
Next loadings ready to go to the North
2019
First of 8 loadings of bridge structures to Norway
2019
Loading of galvanised and painted balcony railings
2019
Next trucks with designed and produced steel structures almost ready to go
2019
Optimized design of steel structures and loading of truck
2019
Container with steel structures and stairs ready for dispatch
2019
Final preparation of stairs and railings for School Project
2019
Fire painted steel for a KIWI shop
2019
Fire painted steel loaded into container
2019
Galvanised balcony railings ready for Scandinavia
2019
First batch of steel for school project in Iceland
2019
Loading of balcony and roof structures
2019
First containers with concrete spiral stairs to Iceland ready
2019
First delivery of railings for a sport stadium
2019
First loading after fire-painting for 210 tons project
2019
First loading of fire painted oversized columns
2019
First loading of painted steel for 2 buildings
2019
First loadings of 140 tons hall
2019
Loading of painted balcony railings
2019
First shippments for the new project in the North
2019
First stairs for a new project ready for loading
2019
First truck of 105 tons project ready
2019
Loading and delivery of oversized welded beams
2019
First trucks loaded for the New Museum project
2019
Galvanised steel ramp and painted fenders
2019
IMG_20190521_134223-1-1080×810
2019
Loading of 2 pcs 27m galvanised stairs
2019
Loading of bended structure up to North Norway
2019
Loading of 2 pcs spiral stairs to Norway
2019
Loading of 42 tons with HSQ beams
2019
Loading of C5 painted structures
2019
Loading of concrete slabs for bridge project
2019
Loading of fire painted beams
2019
Next full trailer loaded to Norway
2019
Loading of fire painted HSQ beams
2019
Loading of galvanised steel for the airport project
2019
Loading of galvanised light steel trusses
2019
Loading of galvanised pipes
2019
Loading of galvanised snow-fenders
2019
Loading of galvanised stairs and railings
2019
Loading of sandwich panels and steel for the factory
2019
Next loading of galvanised structures to Norway
2019
Loading of spiral concrete stairs for sea transport
2019
New steel hall designed and delivered
2019
Steel structures loaded for oversea transport
2018
Next delivery to Norway (design and production)
2019
Next project design and delivery
2019
Light galvanised construction delivered within deadline
2018
Big order of different steel ramps, frames and gratings for industrial project – delivered on time
2018
Fire painted steel structures on the way to the North
2018
Next truck ready to go to Norway
2019
Shippment of railings for a stadium project
2019
First 2 trucks of 4 with painted CE marked structures ready
2018
Next loading of stairs to Trondheim
2019
Next truckload to Norway
2019
Special order almost ready for loading
2019
Loading of 50t steel building in progress
2018
Start of loadings for a new project in Norway
2019
Next delivery of spiral stairs (CE)
2018
First shipment of 90 tons building ready to go
2018
Next oversized shipments ready to go
2018
First truck of 5 ready with spiral stairs
2018
Loading of bridge constructions galvanised and painted
2018
Loading of staircase railings with stainles handrail
2018
First truck of steel balconies and stairs ready
2018
Loading of next shipment of painted HSQ beams
2018
Loading of galv steel basement-boxes with doors
2018
Loading of steel painted staircase railings
2018
Next shipment of fire painted steel structures done
2018
Next shipment of spiral stairs and railings
2018
Loading of container with railings and grates
2018
Next shipment of stairs and railings to Norway
2018
Loading of pire painted steel elements for apartment building
2018
Next delivery to Norway
2018
First truck of fire painted 170t ready to go
2018
Next steel stairs designed and produced on the way to Scandinavia
2018
Next shipment of stairs secured properly and sent out
2018
Next trailers with galvanised steel to Scandinavia loaded
2018
First truck with steel for the hospital building
2018
Next trailers with painted steel structures for the production hall
2018
Optimisation and proper loading of CE marked steel
2018
One of 3 trailers with simple concrete stairs ready
2018
Next order of storage basement steel walls and doors
2018
Full trailer with galvanised gratings on the way to the North
2018
Just before Easter holidays we delivered for an apartment building 27 concrete balcony slabs and steel railings
2018
Over 50 tons galvanised steel for the new airport corridor
2018
Loading and proper securing of stainless balcony railings
2018